New CVE version 2.5.3 is here!

A growing number of customers are now using multicore processors. CVE 2.5.3 automatically makes use of multiple cores if present to speed up the drawing. It also uses an improved drawing algorithm developed as part of a grant-funded research project.Together these improvements can reduce the drawing time for large datasets...

The New Methods for Alarm Rationalisation

Only when you recognise that false alarms are viewed as a fact of life, do you comprehend how serious the issue is. Operating under widened alarms not only has an impact upon control room safety but also significantly impacts production, resulting in financial burdens.

Geometric Process Control (GPC)

Geometric Process Control (GPC) is essentially a patented graphical technology which has been applied to the process industries to enable new levels of process control that were previously not achievable. Process engineers can directly leverage their process knowledge without mathematical intervention.

  • New CVE version 2.5.3 is here!

  • The New Methods for Alarm Rationalisation

  • Geometric Process Control (GPC)

PPCL's Newsletter Archive

Latest versions of PPCL's Software

Having the latest versions of PPCL’s products, you benefit from all the latest features that help you understand, optimise and make your process more efficient.

C Visual Explorer 2.5.3

C Visual Explorer (CVE) uses n-dimensional geometry to extract process insight from the data already collected by your historian.

The latest version 2.5.3. of CVE is essentially about speed!

New features introduced in CVE 2.5.3
• Improved drawing algorithm for even faster drawing
• Better handling of large datasets
• Smaller memory footprint
• Full compatibility with Windows 7

Recent improvements include:
• Better Alarm Management
- Import existing alarm limits
- Automatically find consistent alarm limits
- Calculate annunciation rates and standing alarms
- Many more…
• Batch Process Analysis
- Identify process phases and assign phase numbers
- Automatically calculate batch and phase times
- Select all of a batch or phase from just a few points
- Many more…
• Continuous Process Analysis
- Investigate time delays
- Smooth data
- Calculate and select based on rate of change, or integrated measures
- Many more…
• Quicker Process Analysis and Troubleshooting
- Many missing data options
- Improved distribution plot
- Moving average calculation
- Enlarged box query
- Enhanced cluster variable
- Many more…
• Analyser Support for PAT
• Usability Enhancements

C Process Modeller 1.3.4.2

C Process Modeller (CPM) uses GPC technology to model the operating envelope of a process and show it to the user in a real-time ‘you are here’ display of the many variables.

Some of the features included in the latest version 1.3.4.2 of CPM are:

• Improved Online Running (open and closed loop)
• Real-time quality variable estimation
• Increased model size
• Stability improvements
• Display enhancements
• Simplified GUI
• and many more…

C Response Surface Visualiser 2.0

C Response Surface Visualiser (CRSV) is the predictive model representation of the possible process image, including the determination of interactions of process variables.

Some of the new features introduced in the latest version 2.0 of CRSV are:
• No Limit on Number of Variables
• Use from none to 3 sets of variable labels
• Set Multiple Control Spaces in different colours
• Save and Retrieve your work
• Save the Data Panel
• Two Different Prediction Methods (Middle Value and Distribution)
• and many more…
General Audience:
  • Geometric Process Control Enables Faster and Better Alarm Rationalisation (hosted by IChemE) - May 3rd 2012
  • Condition Monitoring and Fault Prediction - May 23rd 2012
  • Better Alarm Management - June 13th 2012
  • Reducing Operating Costs with Operating Envelopes - July 11th 2012
  • Condition Monitoring and Fault Prediction - July 25th 2012
  • Better Alarm Management - August 8th 2012
  • Batch Analysis and Control - August 22nd 2012

Webinar ScheduleSee full Schedule and Times here
IBC Control Rooms - Alarms
27 - 28 Sept 2011, London, UK

ConferencesSee the full list of Conferences here
Subscribe to PPCL Newsletter
 

Training and Services


PPCL © Copyright 2011. All Rights Reserved. | Terms of use | Privacy Statement
LinkedIn Twitter Google groups