New CVE version 2.5.3 is here!

A growing number of customers are now using multicore processors. CVE 2.5.3 automatically makes use of multiple cores if present to speed up the drawing. It also uses an improved drawing algorithm developed as part of a grant-funded research project.Together these improvements can reduce the drawing time for large datasets...

The New Methods for Alarm Rationalisation

Only when you recognise that false alarms are viewed as a fact of life, do you comprehend how serious the issue is. Operating under widened alarms not only has an impact upon control room safety but also significantly impacts production, resulting in financial burdens.

Geometric Process Control (GPC)

Geometric Process Control (GPC) is essentially a patented graphical technology which has been applied to the process industries to enable new levels of process control that were previously not achievable. Process engineers can directly leverage their process knowledge without mathematical intervention.

  • New CVE version 2.5.3 is here!

  • The New Methods for Alarm Rationalisation

  • Geometric Process Control (GPC)

New CVE version 2.5.3 is here!


CVE Comparison Chart


CVE 2.5.3, released in April 2011, is entitled 'The Performance Pack'
CVE 2.5.3 is essentially about speed!

A growing number of customers are now using multicore processors. CVE 2.5.3 automatically makes use of multiple cores if present to speed up the drawing. It also uses an improved drawing algorithm developed as part of a grant-funded research project.

Together these improvements can reduce the drawing time for large datasets to less than half what it was in CVE 2.5.2 on a dual-core machine (and less still on a 4-core machine). In daily practice PPCL are seeing larger and larger data sets needing processing by CVE. Faster processing times allows quicker handling of these data sets.

Another useful feature of the new version is the smaller memory footprints required for the larger data sets, again resulting in performance improvements for your PC.

Finally, CVE 2.5.3 has full compatibility with Windows 7.

In addition a number of problems identified in version 2.5.2 have been resolved.

There is also a new version (4.1.6) of the CVE Data Tools which fixes a number of bugs.
General Audience:
  • Geometric Process Control Enables Faster and Better Alarm Rationalisation (hosted by IChemE) - May 3rd 2012
  • Condition Monitoring and Fault Prediction - May 23rd 2012
  • Better Alarm Management - June 13th 2012
  • Reducing Operating Costs with Operating Envelopes - July 11th 2012
  • Condition Monitoring and Fault Prediction - July 25th 2012
  • Better Alarm Management - August 8th 2012
  • Batch Analysis and Control - August 22nd 2012

Webinar ScheduleSee full Schedule and Times here
IBC Control Rooms - Alarms
27 - 28 Sept 2011, London, UK

ConferencesSee the full list of Conferences here
Register to Online Material
 

Training and Services


PPCL © Copyright 2011. All Rights Reserved. | Terms of use | Privacy Statement
LinkedIn Twitter Google groups